Case Study : SUR INDEPENDENT POWER PROJECT

IPP project contains about 2.4 km of FiberTie GRP pipes with special Lock Key Jointing system , which has diameter from 2″ (50mm) to 120″ (3050mm) , With total pipe length varying from 3 meter to 12 meters long.

About the author